Keyphrases
Annual Signal
75%
Battery Backup Systems
100%
Battery Capacity
25%
Budget Constraint
25%
Downtime
75%
Engineering Judgment
25%
Event Data
25%
Event-based
100%
Failure Data
25%
Functional Class
25%
Hazard-based Duration Model
25%
High-resolution
25%
High-resolution Data
25%
Operational Requirements
25%
Optimization Scheme
25%
Performance Measures
50%
Performance-based
100%
Planning Project
25%
Power Disruption
25%
Power Failure
50%
Stable Supply
25%
Stochastic Optimization
25%
System Planning
25%
System Use
100%
Traffic Controller
100%
Traffic Counts
25%
Traffic Signal Operations
25%
Traffic Signals
100%
Well-defined
25%
Computer Science
Backup Battery
100%
Battery Capacity
25%
Budget Constraint
25%
Critical Element
25%
Operational Requirement
25%
Performance Measure
50%
Signal Operation
25%
Stochastic Optimization
25%
Systems Planning
25%
Traffic Signal
100%